The project consists of a five-storey main bus depot, a three-storey administrative building and a five-storey dormitory equipped with parking spaces for 715 buses, refuelling and washing facilities, and repair and maintenance facilities with cutting-edge technology to cater for the operation of electric buses. The depot will accommodate additional buses introduced over the years as the overall bus capacity increases under Singapore’s Bus Service Enhancement Programme (BSEP) and Bus Contracting Model (BCM).
Safety Construction: Adhering to Singapore’s Highest Standards
Throughout the construction of Gali Batu, we have strictly adhered to Singapore’s safety standards, ensuring that every aspect of the site meets the national safety requirements. Our construction team undergoes comprehensive safety training before entering the site, is equipped with proper Personal Protective Equipment (PPE), and maintains a high level of vigilance towards potential safety hazards during work. We conduct regular safety inspections to ensure all construction equipment is in good condition and all operations are performed safely. These measures not only protect our workers but also ensure the smooth progress of the project and timely delivery.
Use of Hilti Equipment: Enhancing Work Efficiency
In the Gali Batu project, we extensively used Hilti's advanced equipment. These tools, known for their excellent performance and reliability, greatly simplified the construction process, making our work more efficient and easier. The use of Hilti equipment improved construction efficiency and ensured precision in operations, providing strong support for the project's high-quality completion.