HAI SING SCHOOL Project: Professional Construction and Outstanding Performance

In the HAI SING SCHOOL construction project, our team's core tasks included installing ALC (Autoclaved Lightweight Concrete) panels, performing high-quality plastering, putty treatment, tile laying, and floor construction. These tasks are crucial for the structural integrity and aesthetics of the building, and our professional capabilities were demonstrated in every aspect of the project.


ALC Panel Installation: Efficient and Durable Perfection

One of our primary tasks in the HAI SING SCHOOL project was the installation of ALC panels. ALC panels are lightweight, high-strength, and provide thermal insulation, making them widely used for walls and floors in various buildings. Our team, with extensive experience in ALC panel installation, ensured that a large volume of panels was installed within a short time while maintaining precise alignment and secure fixing of each panel. The excellent performance of ALC panels is evident in their light weight, high strength, and superior soundproofing, fire resistance, and environmental properties, providing solid support for the HAI SING SCHOOL building.

1.png

Plastering: Balancing Smoothness and Speed

In plastering, our team is renowned for its exceptional technical skills. We understand that a smooth wall surface is the foundation for subsequent decorative effects. Therefore, our workers strictly follow standard procedures to ensure that each wall achieves the best possible smoothness. At the same time, we emphasize speed, completing large areas of plastering quickly while maintaining quality, thus gaining valuable time for the project's progress.


Putty Treatment and Tile Laying: Attention to Detail

In putty treatment and tile laying, our team also showcased excellent construction capabilities. Putty treatment requires meticulous operation, and our workers, with their rich experience, can apply putty evenly and smoothly to ensure a beautiful and level surface. Tile laying, a task requiring precision, is handled with strict control over spacing and levelness of each tile, ensuring the final result meets design requirements and has a long service life.

3.png


Floor Construction: Combining Stability and Aesthetics

Floor construction is the final stage of the project and is critical to the overall user experience of the building. We use high-quality materials and advanced construction techniques to ensure the floor's smoothness and durability. Our workers pay attention not only to the practicality of the floor but also to its aesthetic effect, striving to provide a solid and attractive foundation for HAI SING SCHOOL.


Use of Hilti Equipment: Enhancing Work Efficiency

In the HAI SING SCHOOL project, we extensively used Hilti's advanced equipment. These tools, known for their excellent performance and reliability, greatly simplified the construction process, making our work more efficient and easier. The use of Hilti equipment improved construction efficiency and ensured precision in operations, providing strong support for the project's high-quality completion.


Safe Construction: Adhering to Singapore's Highest Standards

Throughout the HAI SING SCHOOL project, we strictly adhered to Singapore's construction safety standards, ensuring that every aspect of the site met national safety requirements. Our construction team underwent comprehensive safety training before entering the site, was equipped with certified personal protective equipment (PPE), and maintained a high level of vigilance towards safety hazards during work. We conduct regular safety checks to ensure that all construction equipment is in good condition and that all operations are within safe limits. These measures not only protect workers' safety but also ensure the smooth progress of the project and timely delivery.


PE Approved Construction Plan: Ensuring Maximum Safety

All construction plans for the HAI SING SCHOOL project were rigorously reviewed and approved by professional engineers (PE). This stringent approval process ensures that our construction methods meet the highest safety standards and fully comply with relevant regulations. With PE-approved construction plans, we can confidently execute each construction step, ensuring that every phase has undergone thorough safety and structural integrity assessments. This not only guarantees worker safety and building stability but also provides our clients with the highest level of assurance.


The HAI SING SCHOOL construction project is a testament to our team's professional capabilities and construction quality. Through efficient ALC panel installation, precise plastering and tile laying, stable floor construction, and the use of Hilti equipment, we ensured the smooth progress and high-quality delivery of the project. Throughout the construction process, we placed safety as our top priority, strictly adhered to construction standards, and obtained professional engineer approvals, further enhancing construction safety and reliability. Moving forward, we will continue to uphold a professional and meticulous approach, providing high-quality construction services to more clients.